Author: chandrasekhar Panda

Operation Procedure of Air Compressor and Dryer


1. OBJECTIVE        To lay down a operation procedure of Air compressor and Dryer. 2.     RESPONSIBILITY Assistant  - Engineering  -  To Follow the SOP Executive – Engineering – To Comply the SOP 3.    PROCEDURE        3.1   PRECAUTIONS Ensure that air outlet valves of Air compressor and air inlet valve of drier are in open condition. Keep ready air compressor and … Continue reading Operation Procedure of Air Compressor and Dryer →

Preventive Maintenance of Air compressor & Dryer


OBJECTIVE              1.1       To lay down a procedure for Preventive Maintenance of Air compressor & Dryer   2.     RESPONSIBILITY                                                   Assistant    Engineering  - To Follow the SOP Executive   Engineering - To comply the SOP 3.     PROCEDURE                        3.1 WEEKLY MAINTENANCE  Clean the air intake filter with compressed air Check and ensure the air compressor load is below 20 Amps during … Continue reading Preventive Maintenance of Air compressor & Dryer →

Preventive Maintenance of Tablet Compression Machine


OBJECTIVE               To lay down a procedure for Preventive Maintenance of Tablet Compression Machine RESPONSIBILITY                                                   Assistant - Engineering    - To follow the SOP Executive - Engineering    - To Comply the SOP PROCEDURE            Weekly maintenance Check the machine rotation with hand wheel, it should rotate freely. Check the hydraulic oil, gearbox oil levels, should be 3/4th of the … Continue reading Preventive Maintenance of Tablet Compression Machine →

Preventive Maintenance of Blister Packing Machine


OBJECTIVE              To lay down a procedure for Preventive Maintenance of Blister packing machine 230 XT, TR-100L. 2. RESPONSIBILITY                                                   Assistant - Engineering &Production  - To follow the SOP Executive - Engineering &Production  - To Comply the SOP 3. PROCEDURE            Weekly Maintenance Check all the movable parts for proper lubrication. Lubricate the Punching tool ball case, Embossing unit, platen … Continue reading Preventive Maintenance of Blister Packing Machine →

Preventive Maintenance of Fluid Bed Drier


OBJECTIVE              1.1       To lay down a procedure for Preventive Maintenance of Fluid Bed Drier-20Kgs, 120Kgs. RESPONSIBILITY                                                   Assistant - Engineering       - To follow the SOP Executive - Engineering       - To Comply the SOP PROCEDURE            Weekly Maintenance Check the pneumatic cylinders and solenoid valves for proper working condition. Check earthing bracket plungers for proper working, if required … Continue reading Preventive Maintenance of Fluid Bed Drier →

Preventive Maintenance of Automatic Capsule Filling


OBJECTIVE                     To lay down a procedure for Preventive Maintenance of Automatic capsule filling line AF-40T, AF-90T, And AF-150T. 2. RESPONSIBILITY                                                   Assistant - Engineering       - To follow the SOP Executive - Engineering      - To Comply the SOP 3. PROCEDURE            Weekly Maintenance Check the oil level in the vacuum pump through view glass and refill the oil if … Continue reading Preventive Maintenance of Automatic Capsule Filling →

Preventive Maintenance of Rapid Mixer Granulator


OBJECTIVE             To lay down a procedure for Preventive Maintenance of Rapid Mixer Granulator-25, 250, 300Ltrs. 2. RESPONSIBILITY   Assistant – Engineering  - to follow the SOP Executive –Engineering  - to comply the SOP 3. PROCEDURE                       Weekly Maintenance Check the lubrication oil in the FRL unit and if required top up with specified lubricant. Check the oil … Continue reading Preventive Maintenance of Rapid Mixer Granulator →

Preventive Maintenance of Octagonal Blender


OBJECTIVE             To lay down the procedure for Preventive Maintenance of Octagonal blender 300, 500, 1000, 1500, 2250 Ltrs. 2. RESPONSIBILITY   Assistant – Engineering   - To follow the SOP Executive – Engineering  - To comply the SOP 3. PROCEDURE                       Monthly Maintenance Check the plumber block housing bolts, if required tight the bolts. Check the gearbox and … Continue reading Preventive Maintenance of Octagonal Blender →

Preventive Maintenance of Multi Mill.


OBJECTIVE              1.1       To lay down the procedure for Preventive Maintenance of Multi Mill. RESPONSIBILITY                                                   Assistant - Engineering       - To follow the SOP Executive - Engineering       - To Comply the SOP PROCEDURE            Monthly Maintenance Check all the fastenings of the unit, if required tight all the fastenings. Check the miller shaft roller bearings, if required clean … Continue reading Preventive Maintenance of Multi Mill. →

Preventive Maintenance of Vibro Sifter


OBJECTIVE             To lay down a procedure for Preventive Maintenance of Vibro Sifter - 12”, 30”. 2.0 RESPONSIBILITY   Assistant – Engineering  - To follow the SOP Executive – Engineering - To comply the SOP 3.0 PROCEDURE                       Monthly Maintenance Check the hopper supporting compression springs for tension and balancing of the hopper. Check the motor amps and … Continue reading Preventive Maintenance of Vibro Sifter →