- OBJECTIVE
- To lay down a procedure for Preventive Maintenance of Automatic capsule filling line AF-40T, AF-90T, And AF-150T.
- 2. RESPONSIBILITY
- Assistant – Engineering – To follow the SOP
- Executive – Engineering – To Comply the SOP
- 3. PROCEDURE
- Weekly Maintenance
- Check the oil level in the vacuum pump through view glass and refill the oil if required.
- Clean the vacuum pump filter and filter chamber.
- Check the powder mixing motor gearbox oil level with level scale and refill the oil if required.
- Switch-off all electrical lines and clean the panel with vacuum.
- Check the Pneumatic cylinder of powder conveying system for proper functioning.
- Monthly Maintenance
- Clean and apply new grease to chain and cam assemblies in side the machine.
- Check all movable parts and tighten all fittings of basic machine and line machines.
- Check solenoid valve and clean the valve, ensure the coil is in working condition.
- Check that all the sensors and inter locks of the machine are working properly.
- Check all solenoid valves and coils of pneumatic controls are working properly.
- Check the metal detector electrical lines and clean the detector head.
- Check and clean the rejection cut out area and spring action of flap.
- Drain the vacuum pump oil and top up with new oil.
- Half -Yearly Maintenance
- Check all the link mechanisms, if found any damage replace the link with bush assembly.
- Check the tamping block springs, if found any damage replace the springs with new one.
- Check the motor bearings of vacuum and dust collection system, if required replace with new bearings.
- Clean the grease of sliding blocks rollers of turret and reapply the new grease to the rollers.
- Check the Metal detector controller circuit; clean the circuit board and contactors with vacuum.
- Check the pneumatic cylinder operation and tight the fastenings of the cylinder.
- Yearly Maintenance
- Check the seals of all shafts, if required replace the seals with new one.
- Check the vanes of the vacuum pump, if required replace with new vanes.
- Check the vacuum pump filter condition, if required replace with new one.
- Check all the cams for proper wetness, if required re grease all the cam tracks.
- Clean all moving segments with kerosene and apply new grease to the segments including bearings.
- Check the condition of the main motor and line motor timer belts, if required replace the timer belts with new one.
- Check all the machine alignments, if require realign the settings using Gauge pins with respective size.
- 4. ABBREVIATIONS
Nil
- 5. REFERENCES
Nil
- 6. ANNEXURES
- Annexure – 1 Weekly preventive maintenance check list
- Annexure – 2 Monthly preventive maintenance check list
- Annexure – 3 Half- yearly preventive maintenance check list
- Annexure – 4 Yearly preventive maintenance check list