- OBJECTIVE
- To lay down a procedure for Preventive Maintenance of Blister packing machine 230 XT, TR-100L.
- 2. RESPONSIBILITY
- Assistant – Engineering &Production – To follow the SOP
- Executive – Engineering &Production – To Comply the SOP
- 3. PROCEDURE
- Weekly Maintenance
- Check all the movable parts for proper lubrication.
- Lubricate the Punching tool ball case, Embossing unit, platen heater assembly and sucker arm unit for friction free movement.
- Check the platen heaters and sealing roller heaters for proper working.
- Check the oil level in the gearboxes with level scale.
- Check the FRL unit oil level and air leakages.
- Quarterly Maintenance
- Check the Vibrating coil for proper functioning, if required adjust the leaf springs for proper vibration.
- Check the clutch for engaging and disengaging in running condition.
- Lubricate all the movable parts including the guide rollers of the PVC or PVDC and Printed foil.
- Check all the inter locks are working properly, if required tighten the line connections.
- Check the stepped motor for proper working, if required adjust the line sensor for better sensing.
- Check the objective-sensing camera for proper function, if required verify the data loaded.
- Check the sealing roller and forming station heaters, if found any one failed replace the heater immediately.
- Yearly Maintenance
- Check all the Pneumatic cylinder seal kits, if found any damage replace the damaged kit.
- Check the bearings of the sealing roller, indexing roller, inching roller, PVC or PVDC draw rollers and printed foil guide rollers, if found any damaged replace worn-out bearings.
- Check the solenoid valves, coils and pneumatic valves condition, if required replace the damaged item.
- Check the timer belt and pulley condition, if required replace the timer belt with new one.
- Check the motor belts condition, if required replace with new belts.
- Drain the gearbox oil and refill with new oil.
- Check the platen heater plates and sealing roller for silicon synthetic polymer coating, if required recoat the silicon synthetic polymer for better performance.
- ABBREVIATIONS
- PVC : POLY VINILE CHLORIDE
- FRL : FILTER REGULATOR LUBRICATOR
- PVDC : POLY VINILE DIECHLORIDE
- REFERENCES
Nil
- ANNEXURES
- Annexure-1 Weekly Preventive maintenance checklist.
- Annexure-2 Quarterly Preventive maintenance checklist.
- Annexure-3 Yearly preventive maintenance checklist.