Preventive Maintenance of MILLI -Q Water System


1.         Objective

  1. To describe the procedure for preventive maintenance of MILLI -Q.

2.         Responsibility

  • Executive  – Instrumentation – To perform the preventive maintenance.
  • Head – Quality Control – To ensure compliance against established schedule.

3.         Procedure

3.1       FOR GENERAL CLEANING:

  • Ensure that the power supply to the instrument is switched ‘ OFF’ before cleaning.
  • Clean the external body  with a clean dry cloth .
  • 3.2 OPERATING PROCEDURE:
  • Check the Q- Guard.
  • Check the Quantum Catridge.
  • Check the Millipak.
  • Check the pyrogard D.
  • Flow Calibration has to do if necessary.
  • Check the POU dispenser.
  • A10 UV lamp has to check.
  • Clean the UV lamp.
  • A10 UV  lamp has to calibrate if necessary.
  • 4.0 ABBREVATIONS
  • SOP – Standard Operating Procedure
  • QC – Quality Control

5. 0    REFERENCES

  • Preventive Maintenance Procedure for Laboratory.

6.0   ANNEXURES

Nil 

Advertisement

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s