Month: March 2021

Operation Procedure of Steam Boiler 6-Ton


1. OBJECTIVE                                           1.1    To lay down a procedure for Operation of steam Boiler  6--Ton. 2.         RESPONSIBILITY    Assistant    Engineering - To Follow the SOP Executive   Engineering - To comply the SOP 3.         PROCEDURE                                                   3.1       PRECAUTIONS   3.1.1    Do not by pass any safety interlock. 3.1.2    Check the mobrey air break switch for low-level indication giving blow down … Continue reading Operation Procedure of Steam Boiler 6-Ton

Advertisement

Operation Procedure of Air Compressor and Dryer


1. OBJECTIVE        To lay down a operation procedure of Air compressor and Dryer. 2.     RESPONSIBILITY Assistant  - Engineering  -  To Follow the SOP Executive – Engineering – To Comply the SOP 3.    PROCEDURE        3.1   PRECAUTIONS Ensure that air outlet valves of Air compressor and air inlet valve of drier are in open condition. Keep ready air compressor and … Continue reading Operation Procedure of Air Compressor and Dryer

Preventive Maintenance of Air compressor & Dryer


OBJECTIVE              1.1       To lay down a procedure for Preventive Maintenance of Air compressor & Dryer   2.     RESPONSIBILITY                                                   Assistant    Engineering  - To Follow the SOP Executive   Engineering - To comply the SOP 3.     PROCEDURE                        3.1 WEEKLY MAINTENANCE  Clean the air intake filter with compressed air Check and ensure the air compressor load is below 20 Amps during … Continue reading Preventive Maintenance of Air compressor & Dryer

Preventive Maintenance of Tablet Compression Machine


OBJECTIVE               To lay down a procedure for Preventive Maintenance of Tablet Compression Machine RESPONSIBILITY                                                   Assistant - Engineering    - To follow the SOP Executive - Engineering    - To Comply the SOP PROCEDURE            Weekly maintenance Check the machine rotation with hand wheel, it should rotate freely. Check the hydraulic oil, gearbox oil levels, should be 3/4th of the … Continue reading Preventive Maintenance of Tablet Compression Machine

Preventive Maintenance of Blister Packing Machine


OBJECTIVE              To lay down a procedure for Preventive Maintenance of Blister packing machine 230 XT, TR-100L. 2. RESPONSIBILITY                                                   Assistant - Engineering &Production  - To follow the SOP Executive - Engineering &Production  - To Comply the SOP 3. PROCEDURE            Weekly Maintenance Check all the movable parts for proper lubrication. Lubricate the Punching tool ball case, Embossing unit, platen … Continue reading Preventive Maintenance of Blister Packing Machine

Preventive Maintenance of Fluid Bed Drier


OBJECTIVE              1.1       To lay down a procedure for Preventive Maintenance of Fluid Bed Drier-20Kgs, 120Kgs. RESPONSIBILITY                                                   Assistant - Engineering       - To follow the SOP Executive - Engineering       - To Comply the SOP PROCEDURE            Weekly Maintenance Check the pneumatic cylinders and solenoid valves for proper working condition. Check earthing bracket plungers for proper working, if required … Continue reading Preventive Maintenance of Fluid Bed Drier

Preventive Maintenance of Automatic Capsule Filling


OBJECTIVE                     To lay down a procedure for Preventive Maintenance of Automatic capsule filling line AF-40T, AF-90T, And AF-150T. 2. RESPONSIBILITY                                                   Assistant - Engineering       - To follow the SOP Executive - Engineering      - To Comply the SOP 3. PROCEDURE            Weekly Maintenance Check the oil level in the vacuum pump through view glass and refill the oil if … Continue reading Preventive Maintenance of Automatic Capsule Filling

Preventive Maintenance of Rapid Mixer Granulator


OBJECTIVE             To lay down a procedure for Preventive Maintenance of Rapid Mixer Granulator-25, 250, 300Ltrs. 2. RESPONSIBILITY   Assistant – Engineering  - to follow the SOP Executive –Engineering  - to comply the SOP 3. PROCEDURE                       Weekly Maintenance Check the lubrication oil in the FRL unit and if required top up with specified lubricant. Check the oil … Continue reading Preventive Maintenance of Rapid Mixer Granulator

Preventive Maintenance of Octagonal Blender


OBJECTIVE             To lay down the procedure for Preventive Maintenance of Octagonal blender 300, 500, 1000, 1500, 2250 Ltrs. 2. RESPONSIBILITY   Assistant – Engineering   - To follow the SOP Executive – Engineering  - To comply the SOP 3. PROCEDURE                       Monthly Maintenance Check the plumber block housing bolts, if required tight the bolts. Check the gearbox and … Continue reading Preventive Maintenance of Octagonal Blender

Preventive Maintenance of Multi Mill.


OBJECTIVE              1.1       To lay down the procedure for Preventive Maintenance of Multi Mill. RESPONSIBILITY                                                   Assistant - Engineering       - To follow the SOP Executive - Engineering       - To Comply the SOP PROCEDURE            Monthly Maintenance Check all the fastenings of the unit, if required tight all the fastenings. Check the miller shaft roller bearings, if required clean … Continue reading Preventive Maintenance of Multi Mill.