1. OBJECTIVE 1.1 To lay down a procedure for Operation of steam Boiler 6--Ton. 2. RESPONSIBILITY Assistant Engineering - To Follow the SOP Executive Engineering - To comply the SOP 3. PROCEDURE 3.1 PRECAUTIONS 3.1.1 Do not by pass any safety interlock. 3.1.2 Check the mobrey air break switch for low-level indication giving blow down … Continue reading Operation Procedure of Steam Boiler 6-Ton
Month: March 2021
Operation Procedure of Air Compressor and Dryer
1. OBJECTIVE To lay down a operation procedure of Air compressor and Dryer. 2. RESPONSIBILITY Assistant - Engineering - To Follow the SOP Executive – Engineering – To Comply the SOP 3. PROCEDURE 3.1 PRECAUTIONS Ensure that air outlet valves of Air compressor and air inlet valve of drier are in open condition. Keep ready air compressor and … Continue reading Operation Procedure of Air Compressor and Dryer
Preventive Maintenance of Air compressor & Dryer
OBJECTIVE 1.1 To lay down a procedure for Preventive Maintenance of Air compressor & Dryer 2. RESPONSIBILITY Assistant Engineering - To Follow the SOP Executive Engineering - To comply the SOP 3. PROCEDURE 3.1 WEEKLY MAINTENANCE Clean the air intake filter with compressed air Check and ensure the air compressor load is below 20 Amps during … Continue reading Preventive Maintenance of Air compressor & Dryer
Preventive Maintenance of Tablet Compression Machine
OBJECTIVE To lay down a procedure for Preventive Maintenance of Tablet Compression Machine RESPONSIBILITY Assistant - Engineering - To follow the SOP Executive - Engineering - To Comply the SOP PROCEDURE Weekly maintenance Check the machine rotation with hand wheel, it should rotate freely. Check the hydraulic oil, gearbox oil levels, should be 3/4th of the … Continue reading Preventive Maintenance of Tablet Compression Machine
Preventive Maintenance of Blister Packing Machine
OBJECTIVE To lay down a procedure for Preventive Maintenance of Blister packing machine 230 XT, TR-100L. 2. RESPONSIBILITY Assistant - Engineering &Production - To follow the SOP Executive - Engineering &Production - To Comply the SOP 3. PROCEDURE Weekly Maintenance Check all the movable parts for proper lubrication. Lubricate the Punching tool ball case, Embossing unit, platen … Continue reading Preventive Maintenance of Blister Packing Machine
Preventive Maintenance of Fluid Bed Drier
OBJECTIVE 1.1 To lay down a procedure for Preventive Maintenance of Fluid Bed Drier-20Kgs, 120Kgs. RESPONSIBILITY Assistant - Engineering - To follow the SOP Executive - Engineering - To Comply the SOP PROCEDURE Weekly Maintenance Check the pneumatic cylinders and solenoid valves for proper working condition. Check earthing bracket plungers for proper working, if required … Continue reading Preventive Maintenance of Fluid Bed Drier
Preventive Maintenance of Automatic Capsule Filling
OBJECTIVE To lay down a procedure for Preventive Maintenance of Automatic capsule filling line AF-40T, AF-90T, And AF-150T. 2. RESPONSIBILITY Assistant - Engineering - To follow the SOP Executive - Engineering - To Comply the SOP 3. PROCEDURE Weekly Maintenance Check the oil level in the vacuum pump through view glass and refill the oil if … Continue reading Preventive Maintenance of Automatic Capsule Filling
Preventive Maintenance of Rapid Mixer Granulator
OBJECTIVE To lay down a procedure for Preventive Maintenance of Rapid Mixer Granulator-25, 250, 300Ltrs. 2. RESPONSIBILITY Assistant – Engineering - to follow the SOP Executive –Engineering - to comply the SOP 3. PROCEDURE Weekly Maintenance Check the lubrication oil in the FRL unit and if required top up with specified lubricant. Check the oil … Continue reading Preventive Maintenance of Rapid Mixer Granulator
Preventive Maintenance of Octagonal Blender
OBJECTIVE To lay down the procedure for Preventive Maintenance of Octagonal blender 300, 500, 1000, 1500, 2250 Ltrs. 2. RESPONSIBILITY Assistant – Engineering - To follow the SOP Executive – Engineering - To comply the SOP 3. PROCEDURE Monthly Maintenance Check the plumber block housing bolts, if required tight the bolts. Check the gearbox and … Continue reading Preventive Maintenance of Octagonal Blender
Preventive Maintenance of Multi Mill.
OBJECTIVE 1.1 To lay down the procedure for Preventive Maintenance of Multi Mill. RESPONSIBILITY Assistant - Engineering - To follow the SOP Executive - Engineering - To Comply the SOP PROCEDURE Monthly Maintenance Check all the fastenings of the unit, if required tight all the fastenings. Check the miller shaft roller bearings, if required clean … Continue reading Preventive Maintenance of Multi Mill.